Friday, 12 October 2012

Following completion of the beam and block flooring, the damp proof membrane (DPM) is laid and screeding poured. Then the pre insulated timber frame panels are lifted into place.
 
 
The scaffolding is erected to provide access to the first floor and roof.
 
 